150 MW BESS under construction in Pecos, TX — Electric Reliability Council of Texas, Inc.
150 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
—
Operating Since
Coordinates
30.9161, -102.8553
County
Pecos, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Lydian Energy | — | — |
| Owner(s) | Lydian Energy | — | — |
| Status | Under construction | — | — |
Headcamp BESS is a 150 MW battery energy storage system located in Pecos County, Texas. The plant, identified by the EIA plant code 68580, is operated by Lydian Energy. It consists of a single generator and utilizes MWH as its primary fuel source, indicating it draws power from the grid to charge its batteries. The facility operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, which falls under the Texas Reliability Entity (TRE) NERC region.
Headcamp BESS ranks as the 171st largest power plant in Texas out of 224 facilities and holds the 402nd position nationally out of 514 plants. Recent news articles indicate activity related to deals involving the plant.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Headcamp BESSERCOT-23INR0401
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
16th Street Substation · 138 kV
Substation Distance
0.223 km
Operator
Texas-New Mexico Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
DGFS_ESR_RN
Pricing Hub
HB_WEST
Secondary Zone
LZ_WEST
Location Type
Resource Node
Node Source
Curated node match