3.3 MW Solar operating in Onondaga, NY — New York Independent System Operator
3.3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
43.0650, -76.2196
County
Onondaga, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Abundant Solar Power Inc. | Abundant Solar Power Inc. | — |
| Owner(s) | Abundant Solar Power Inc. | Abundant Solar Power Inc. | — |
| Status | Operating | operating | — |
GEM identifies the owner as Abundant Solar Power Inc.
This entity is not yet in the GEM ownership database — chain unavailable.
USNY - Geddes is a 3.3 MW solar photovoltaic power plant located in Onondaga County, New York. The plant began operating in 2025 and utilizes fixed-tilt solar tracking technology. It has one generator and is owned and operated by Abundant Solar Power Inc. The plant's primary fuel source is solar (SUN).
The facility operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In terms of size, USNY - Geddes ranks as the 401st largest power plant in New York out of 695, and 3726th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
New York Independent System Operator
Grid Voltage
115 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
CH_RES_SYRACUSE
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone C
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.