2.3 MW Solar under construction in Will, IL — PJM Interconnection, LLC
2.3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
Coordinates
41.4537, -87.7500
County
Will, IL
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Catalyze University Park Central Ave Microgrid, LLC | — | — |
| Owner(s) | Catalyze University Park Central Ave Microgrid, LLC | — | — |
| Status | Under construction | operating | — |
The IL University Park 450 Central Ave solar photovoltaic plant is located in Will County, Illinois. The facility has a total capacity of 2.3 MW and consists of a single generator. It is owned and operated by Catalyze University Park Central Ave Microgrid, LLC. The plant utilizes fixed-tilt solar tracking technology.
The facility interconnects to the PJM Interconnection, LLC balancing authority, within the RFC NERC region. According to state rankings, the plant is the 78th largest of 320 solar facilities in Illinois. Nationally, it ranks as the 4435th largest of 7108 solar plants. The plant's primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
University Park North EC Substation · 345 kV
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
N ILLINOIS HUB
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.