489.7 MW Natural Gas planned in Nodaway, MO — Southwest Power Pool
489.7 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Fired Combustion Turbine
Technology
Planned: —
Planned Operation
Coordinates
38.0059, -97.9217
County
Nodaway, MO
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Evergy Missouri West | Evergy Missouri West | — |
| Owner(s) | Evergy Missouri West | Evergy | — |
| Status | Planned | — | — |
Mullin Creek #1 Generating Station is a 489.7 MW natural gas-fired power plant located in Nodaway County, Missouri. The plant, owned by Evergy and operated by Evergy Missouri West, consists of a single natural gas-fired combustion turbine generator. It is connected to the Southwest Power Pool (SPP) balancing authority and resides within the Midcontinent Reliability Organization (MRO) NERC region.
The plant is the 8th largest of 20 power plants in Missouri, and ranks 493rd out of 945 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Southwest Power Pool
Grid Voltage
345 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
SPP
LMP Node
—
Pricing Hub
SPP South Hub
Secondary Zone
SPP North Hub
Node Source
OSM spatial match
Red Flag Warning: Russell; Lincoln; Barton; Ellsworth; Saline; Rice; McPherson; Marion; Chase; Reno; Harvey; Butler; G
Red Flag Warning issued March 21 at 12:25PM CDT until March 22 at 8:00PM CDT by NWS Wichita KS
Red Flag Warning: Russell; Lincoln; Barton; Ellsworth; Saline; Rice; McPherson; Marion; Chase; Reno; Harvey; Butler; G
Red Flag Warning issued March 21 at 12:25PM CDT until March 21 at 10:00PM CDT by NWS Wichita KS
Wind Advisory: Russell; Lincoln; Barton; Ellsworth; Saline; Rice; McPherson; Marion; Chase; Reno; Harvey; Butler; G
Wind Advisory issued March 21 at 11:54AM CDT until March 22 at 8:00PM CDT by NWS Wichita KS
Evergy receives Missouri approval to build gas plants, solar farms after Kansas thumbs-up
Missouri regulators approved Evergy's request to build three natural gas plants and two solar farms.
Last updated 2026-03-21
View all 6 articles