1 MW Solar operating in Tulare, CA — California Independent System Operator
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2019
Operating Since
Coordinates
36.3220, -119.3510
County
Tulare, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SoCore Energy LLC | — | — |
| Owner(s) | SoCore Energy LLC | — | — |
| Status | Operating | operating | — |
The Tulare Akers Professional Center is a 1 MW solar photovoltaic power plant located in Tulare County, California. The plant began operating in 2019 and has one generator. SoCore Energy LLC is the plant's operator. The facility utilizes a fixed tilt solar tracking system.
The plant's latest annual generation was 1,605 MWh, resulting in a capacity factor of 18.3%. The Tulare Akers Professional Center connects to the grid within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, the plant ranks 852 out of 862 solar facilities in California, and 7042 out of 7108 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
0.48 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
56 MWh
Latest Month
1.6K MWh
Annual Generation
18.3%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Oak Grove Substation · 66 kV
Substation Distance
< 10 km
Operator
Southern California Edison
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_ZP26_GEN-APND
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.