66.6 MW Solar planned in Bosque, TX — Electric Reliability Council of Texas, Inc.
66.6 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
31.6260, -97.6421
County
Bosque, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Belltown Power Texas 2, LLC | — | — |
| Owner(s) | Belltown Power Texas 2, LLC | — | — |
| Status | Planned | pre-construction | — |
Symank Solar is a 66.6 MW solar photovoltaic power plant located in Bosque County, Texas. The plant's primary fuel source is the sun. It consists of a single generator utilizing fixed-tilt solar tracking technology. Belltown Power Texas 2, LLC owns and operates the facility.
The plant is located within the Electric Reliability Council of Texas (ERCOT) balancing authority, which falls under the Texas Reliability Entity (TRE) NERC region. Symank Solar ranks as the 206th largest power plant in Texas out of 298, and nationally it ranks 1023 out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
69 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
Plant coordinates only
Winners Announced: D CEO’s Energy Awards 2023
Honorees include Ashleigh Bell of Elk Range Royalties, John Billingsley of JBB Advanced Technologies, Kipper Overstreet of Clearfork...
Last updated 2026-03-14
View all articles