176.6 MW Batteries (76 MW) + Solar Photovoltaic (101 MW) planned in Goliad, TX — Electric Reliability Council of Texas, Inc.
176.6 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
28.4200, -97.7093
County
Goliad, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Belltown Power Texas 2, LLC | — | — |
| Owner(s) | Belltown Power Texas 2, LLC | — | — |
| Status | Planned | pre-construction | — |
Myers Solar and Storage is a hybrid power plant located in Goliad County, Texas. The facility, owned and operated by Belltown Power Texas 2, LLC, has a total capacity of 176.6 MW across two generators. The plant utilizes both solar photovoltaic technology and battery storage, with the primary fuel listed as MWH. The solar component uses a fixed tilt tracking system.
The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, in the TRE NERC region. Myers Solar and Storage is ranked as the 141st largest power plant in Texas out of 224, and 343rd nationally out of 514. News coverage of the plant includes 7 articles, with topics including grid, industry, deals, and regulatory matters.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
69 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Beeville Substation · 69 kV
Substation Distance
< 10 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_SOUTH
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Last updated 2026-03-26
View all 10 articles