293 MW Batteries (146 MW) + Solar Photovoltaic (147 MW) planned in Mills, TX — Electric Reliability Council of Texas, Inc.
293 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
31.5689, -98.8220
County
Mills, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Red River Clean Energy | — | — |
| Owner(s) | Red River Clean Energy | — | — |
| Status | Planned | pre-construction | — |
Chisme Solar and Storage, located in Mills County, Texas, is a hybrid power plant combining solar photovoltaic generation with battery storage. The plant has a total capacity of 293 MW and is operated by Red River Clean Energy. It consists of two generators utilizing both solar and battery technologies. The solar component uses a fixed tilt tracking system.
The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. Chisme Solar and Storage is ranked as the 56th largest power plant in Texas out of 224, and nationally it is ranked 170th out of 514 plants. The primary fuel type listed is MWH, reflecting the plant's reliance on electricity generation and storage.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
Plant coordinates only