250 MW Solar operating in Adair, MO — Midcontinent Independent Transmission System Operator, Inc..
250 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
40.1261, -92.5641
County
Adair, MO
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Clean Energy | AES Clean Energy | — |
| Owner(s) | AES Clean Energy | AES Clean Energy | — |
| Status | Operating | operating | — |
GEM identifies the owner as AES Clean Energy
This entity is not yet in the GEM ownership database — chain unavailable.
Morris Solar is a 250 MW solar photovoltaic power plant located in Adair County, Missouri. The plant, which began operating in 2025, is owned and operated by AES Clean Energy. It utilizes a fixed-tilt solar tracking system. The plant is connected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and is within the SERC NERC region.
In its latest year of operation, Morris Solar generated 238,307 MWh of electricity, achieving a capacity factor of 18.6%. The facility is the second-largest solar plant in Missouri (out of 7) and ranks 130th nationally among 639 solar plants.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
13.1K MWh
Latest Month
238.3K MWh
Annual Generation
18.6%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Zachary Substation · 345 kV
Substation Distance
0.057 km
Operator
Ameren
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
AMMO.MRRIS.SLR
Pricing Hub
ILLINOIS.HUB
Location Type
Generation Node
Node Source
Curated node match
U.S. installs 14.5 GW of large-scale solar in the first half of 2025
Solar represented 75% of grid capacity additions in the first half, followed distantly by wind and natural gas, said new data from the...
91% of new electrical capacity added in first half of 2025 was solar and wind
A review by the SUN DAY Campaign of data just released by the Federal Energy Regulatory Commission (FERC) reveals that the combination of...
Morris Ridge solar farm now operational in Livingston County
EDF Renewables says the solar project can generate electricity for Livingston and Wyoming counties.
Last updated 2026-03-14