3.9 MW Solar operating in Hartford, CT — ISO New England Inc.
3.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
41.9038, -72.6581
County
Hartford, CT
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Telyon AMZ Windsor LLC | — | — |
| Owner(s) | Telyon AMZ Windsor LLC | — | — |
| Status | Operating | operating | — |
Amazon BDL4 is a solar photovoltaic power plant located in Hartford County, Connecticut. The plant has a total capacity of 3.9 MW and began operating in 2025. It is owned and operated by Telyon AMZ Windsor LLC. The facility utilizes a single generator and employs fixed-tilt solar tracking technology.
The plant's primary fuel source is solar energy. Amazon BDL4 operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In terms of size, the plant ranks as the 23rd largest solar facility in Connecticut out of 88, and it holds a national ranking of 3551 out of 7108 solar plants.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
23 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
Commercial Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Windsor Locks Substation · 115 kV
Substation Distance
3.119 km
Operator
Eversource
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.WNDSRLKS23
Pricing Hub
.Z.CONNECTICUT
Node Source
Curated node match