300 MW Batteries (150 MW) + Solar Photovoltaic (150 MW) planned in White, IL — Midcontinent Independent Transmission System Operator, Inc..
300 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
38.0290, -88.2840
County
White, IL
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Vesper Energy Development LLC | Vesper Energy | — |
| Owner(s) | Vesper Energy Development LLC | Vesper Energy | — |
| Status | Planned | announced | — |
GEM identifies the owner as Vesper Energy
This entity is not yet in the GEM ownership database — chain unavailable.
Meadow Springs Renewable Energy (Hybrid) is a 300 MW hybrid power plant located in White County, Illinois. The facility, identified by plant ID 67986, is owned and operated by Vesper Energy Development LLC. It utilizes both solar photovoltaic technology and battery storage, with a fixed tilt solar tracking system. The plant's primary fuel source is electricity (MWH), reflecting its hybrid nature. It has two generators.
Meadow Springs operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the SERC NERC region. Among hybrid plants in Illinois, it is ranked 1 out of 3. Nationally, it holds a rank of 156 out of 514 hybrid plants.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Norris City North Substation · 345 kV
Substation Distance
< 10 km
Operator
Ameren
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
ABB MISO IL
Pricing Hub
ILLINOIS.HUB
Node Source
EIA-860 direct report
Katy homeowners stopped a battery project, now the developer wants the state to overrule them
Tags: local land-use dispute, Katy, Ochoa Energy, Vesper Energy, Ochoa Energy Storage, Katy High School, Katy City Council. KATY, Texas...
Katy homeowners stopped a battery project, now the developer wants the state to overrule them
Tags: local land-use dispute, Katy, Ochoa Energy, Vesper Energy, Ochoa Energy Storage, Katy High School, Katy City Council. KATY, Texas...
Katy homeowners stopped a battery project, now the developer wants the state to overrule them
Tags: local land-use dispute, Katy, Ochoa Energy, Vesper Energy, Ochoa Energy Storage, Katy High School, Katy City Council. KATY, Texas...
Katy homeowners stopped a battery project, now the developer wants the state to overrule them
Tags: local land-use dispute, Katy, Ochoa Energy, Vesper Energy, Ochoa Energy Storage, Katy High School, Katy City Council. KATY, Texas...
Last updated 2026-03-26
View all 10 articles