800 MW Batteries (400 MW) + Solar Photovoltaic (400 MW) planned in Churchill, NV — Nevada Power Company
800 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
39.8536, -119.0394
County
Churchill, NV
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Sierra Pacific Power Co | Sierra Pacific Power Co | — |
| Owner(s) | Sierra Pacific Power Co | Berkshire Hathaway | — |
| Status | Planned | pre-construction | — |
Sierra Solar Hybrid is an 800 MW hybrid power plant located in Churchill County, Nevada. The plant is owned by Berkshire Hathaway and operated by Sierra Pacific Power Company. It utilizes both solar photovoltaic technology and battery storage, with a primary fuel source listed as MWH. The solar component uses a fixed tilt tracking system.
The plant is the second-largest of 20 power plants in Nevada, and ranks 22nd out of 514 plants nationally. It operates within the Nevada Power Company balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. News reports indicate some regulatory interest in the plant.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Nevada Power Company
Grid Voltage
345 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
No generation data available for this plant.
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
Nevada utility NV Energy seeks approval for 1GW+ of battery storage PPAs in 2024 resource plan
NV Energy is seeking approval from the Public Utilities Commission of Nevada of its 2024 IRP which it submitted on 31 May 2024.
Last updated 2026-03-14