100 MW Solar operating in Ashley, AR — Midcontinent Independent Transmission System Operator, Inc..
100 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
33.0961, -91.9479
County
Ashley, AR
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cubico USA, LLC | Cubico Sustainable Investments | — |
| Owner(s) | Cubico USA, LLC | Cubico USA LLC | — |
| Status | Operating | operating | — |
GEM identifies the owner as Cubico USA LLC
This entity is not yet in the GEM ownership database — chain unavailable.
Crossett Solar is a 100 MW solar photovoltaic power plant located in Ashley County, Arkansas. The plant began operating in 2024 and is owned and operated by Cubico USA, LLC. It utilizes single-axis tracking technology. As of the most recent data, Crossett Solar ranks as the 14th largest solar plant in Arkansas out of 16, and 613th nationally out of 639.
The plant's latest annual generation was 208,718 MWh, resulting in a capacity factor of 23.8%. Crossett Solar operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the SERC Reliability Corporation NERC region. Financial data is available for the plant from LBNL, though specific figures are not provided.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
115 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
8.9K MWh
Latest Month
208.7K MWh
Annual Generation
23.8%
Capacity Factor
$43.2/MWh
LCOE (Levelized Cost)
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
ARKANSAS.HUB
Node Source
OSM spatial match
Google-tied solar park in Arkansas reaches commerical operations
Cubico Sustainable Investments has commenced commercial operations at the 132MW Crossett solar park in Ashley County, Arkansas, US.
Crossett Solar Park enters operation
A privately-owned renewable energy company has announced the commencement of operations at Crossett Solar Park, a 132 MW solar PV facility located in Ashley...
Cubico’s 132 MWdc Crossett Solar Park enters commercial operations
Cubico Sustainable Investments has announced the commencement of operations at Crossett Solar Park, a a 132MWdc solar PV facility located in...
Crossett Solar Park commences supplying energy to Google
Cubico Sustainable Investments has announced the start of commercial operations at Crossett solar park, a 132MWdc solar facility.
Last updated 2026-03-26