1.3 MW Solar operating in Fresno, CA — California Independent System Operator
1.3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
36.2532, -120.2293
County
Fresno, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Harris Farms Inc | — | — |
| Owner(s) | Harris Farms Inc | — | — |
| Status | Operating | operating | — |
Harris Farms Solar Facility is a 1.3 MW solar photovoltaic power plant located in Fresno County, California. The plant began operating in 2024 and is owned and operated by Harris Farms Inc. It utilizes a single-axis tracking system to maximize solar energy capture. The facility is interconnected with the California Independent System Operator (CAISO) balancing authority and is within the Western Electricity Coordinating Council (WECC) NERC region.
In its latest year of operation, the Harris Farms Solar Facility generated 2,956 MWh of electricity, achieving a capacity factor of 25.9%. The plant is ranked 696th out of 862 solar facilities in California and 6092nd out of 7108 solar facilities nationally. The facility has one generator using SUN as its primary fuel.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Commercial
Sector
Industrial Non-CHP
138 MWh
Latest Month
3.0K MWh
Annual Generation
25.9%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Pleasant Valley Pumps
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_ZP26_GEN-APND
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.