1.2 MW Solar operating in Tulare, CA — California Independent System Operator
1.2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
36.1228, -119.4477
County
Tulare, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Bravo REC Management LLC | — | — |
| Owner(s) | TWC | — | — |
| Status | Operating | operating | — |
The TWC solar photovoltaic plant is located in Tulare County, California. The plant, owned and operated by Bravo REC Management LLC, has a total capacity of 1.2 MW. It commenced operations in 2024 and consists of a single generator utilizing single-axis tracking technology.
In its latest year of operation, the plant generated 918 MWh of electricity, achieving a capacity factor of 8.7%. The TWC plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, the plant ranks 719th out of 862 solar plants in California, and 6186th out of 7108 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
480 kV
Regulatory Status
NR
Entity Type
Industrial
Sector
Industrial Non-CHP
71 MWh
Latest Month
918 MWh
Annual Generation
8.7%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Octol Substation · 66 kV
Substation Distance
< 10 km
Operator
Southern California Edison
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_ZP26_GEN-APND
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.