26 MW Batteries (13 MW) + Solar Photovoltaic (13 MW) planned in Yolo, CA — California Independent System Operator
26 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
38.6784, -121.9876
County
Yolo, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Emeren US, LLC | — | — |
| Owner(s) | Gibson Renewables LLC | — | — |
| Status | Planned | pre-construction | — |
The Gibson Solar Project - Hybrid is a 26 MW hybrid power plant located in Yolo County, California. The facility is owned and operated by Emeren US, LLC. It utilizes both solar photovoltaic technology and battery storage. The solar component employs a fixed-tilt tracking system.
The plant's primary fuel source is listed as MWH, reflecting its reliance on solar energy and stored electricity. Gibson Solar operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. It is ranked as the 175th largest power plant in California out of 300, and 662nd nationally out of 1205.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
21 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
MADISON_1_N001
Pricing Hub
TH_NP15_GEN-APND
Location Type
Pricing Node
Node Source
EIA-860 direct report
Last updated 2026-03-26