1.9 MW Solar under construction in Winnebago, IL — PJM Interconnection, LLC
1.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
Coordinates
42.3379, -89.0826
County
Winnebago, IL
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Clean Energy | AES Clean Energy | — |
| Owner(s) | AES Clean Energy | AES Clean Energy | — |
| Status | Under construction | operating | — |
GEM identifies the owner as AES Clean Energy
This entity is not yet in the GEM ownership database — chain unavailable.
AES Bend Solar II, LLC is a 1.9 MW solar photovoltaic power plant located in Winnebago County, Illinois. The plant, identified by plant code 67718, utilizes a fixed tilt solar tracking system. It is owned and operated by AES Clean Energy. The plant is interconnected to the grid within the PJM Interconnection, LLC balancing authority and the MRO NERC region.
The facility ranks as the 268th largest power plant in Illinois out of 320 plants in the state, and nationally it ranks 5448 out of 7108 plants. The plant consists of a single generator and uses solar energy as its primary fuel source.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
12.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Roscoe Bert Substation · 138 kV
Substation Distance
2.329 km
Operator
Commonwealth Edison
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
163 ROSC138 KV TR71 12
Pricing Hub
N ILLINOIS HUB
Location Type
Load Node
Node Source
Curated node match