1.8 MW Solar operating in Baltimore, MD — PJM Interconnection, LLC
1.8 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
39.2695, -76.5535
County
Baltimore, MD
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | PFMD LL Baltimore LLC | — | — |
| Owner(s) | PFMD LL Baltimore LLC | — | — |
| Status | Operating | operating | — |
The MD BALTIMORE 4851 HOLABIRD AVE solar photovoltaic plant is located in Baltimore County, Maryland. The plant has a total capacity of 1.8 MW and began operating in 2025. It consists of a single generator utilizing fixed tilt solar tracking technology. The plant is owned and operated by PFMD LL Baltimore LLC.
The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. According to available rankings, the facility is the 126th largest solar plant in Maryland out of 183, and ranks 5484th nationally out of 7108 plants. The primary fuel source for the plant is solar energy (SUN).
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
0.48 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
PJM
LMP Node
HIGHLAND13.8 KV 110-2LD
Pricing Hub
WESTERN HUB
Location Type
Load Node
Node Source
Curated node match