5 MW Solar planned in Grundy, IL — PJM Interconnection, LLC
5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
41.1940, -88.2945
County
Grundy, IL
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cypress Creek Renewables | Cypress Creek Renewables | — |
| Owner(s) | Cypress Creek Renewables | Cypress Creek Renewables | — |
| Status | Planned | pre-construction | — |
GEM identifies the owner as Cypress Creek Renewables
This entity is not yet in the GEM ownership database — chain unavailable.
The Gillard solar photovoltaic plant is located in Grundy County, Illinois. It has a total capacity of 5 MW across one generator. The plant is owned and operated by Cypress Creek Renewables. Gillard ranks as the 44th largest solar plant in Illinois out of 320, and 2451st nationally out of 7108.
The plant utilizes fixed-tilt solar tracking technology. Gillard is located within the PJM Interconnection balancing authority and the RFC NERC region. The primary fuel source for the plant is solar energy.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
34.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
N ILLINOIS HUB
Node Source
Shared substation inference