4.3 MW Solar operating in St Lawrence, NY — New York Independent System Operator
4.3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
44.7565, -75.1604
County
St Lawrence, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cypress Creek Renewables | Cypress Creek Renewables | — |
| Owner(s) | Cypress Creek Renewables | Cypress Creek Renewables | — |
| Status | Operating | operating | — |
GEM identifies the owner as Cypress Creek Renewables
This entity is not yet in the GEM ownership database — chain unavailable.
The Acer solar photovoltaic plant, identified by plant ID 67632, is located in St Lawrence County, New York. The facility has a total capacity of 4.3 MW and commenced operations in 2024. It consists of a single generator utilizing solar photovoltaic technology with single-axis tracking. Cypress Creek Renewables is the owner and operator of the plant.
Acer operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In its latest year of operation, the plant generated 68 MWh of electricity, achieving a capacity factor of 0.2%. Acer ranks as the 321st largest power plant in New York out of 695 facilities and holds a national ranking of 3334 out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
New York Independent System Operator
Grid Voltage
13.2 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
68 MWh
Latest Month
68 MWh
Annual Generation
0.2%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
NYISO
LMP Node
BRADY____115KV_TB2
Pricing Hub
NYISO Zone D
Node Source
Curated node match