91.2 MW Solar planned in Hill, TX — Electric Reliability Council of Texas, Inc.
91.2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
31.7962, -97.2028
County
Hill, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Greenalia Solar Power Leitrim, LLC | Greenalia SA | — |
| Owner(s) | Greenalia Solar Power Leitrim, LLC | Smarttia | — |
| Status | Planned | pre-construction | — |
Leitrim Solar Park is a 91.2 MW solar photovoltaic power plant located in Hill County, Texas. The plant, identified by plant ID 67544, is owned by Smarttia, a company based in Spain, and operated by Greenalia Solar Power Leitrim, LLC. The facility utilizes fixed-tilt solar tracking technology.
The plant's output is delivered to the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority. Leitrim Solar Park ranks as the 194th largest solar plant in Texas out of 298, and 661st nationally out of 7108. The plant has one generator and its primary fuel source is the sun. The plant's NERC region is TRE.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Rogers Hill Substation · 138 kV
Substation Distance
< 10 km
Operator
Brazos Electric
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
WND_WHITNEY
Pricing Hub
HB_NORTH
Secondary Zone
LZ_NORTH
Location Type
Resource Node
Node Source
EIA-860 direct report