150 MW Solar operating in Lee, IA — Midcontinent Independent Transmission System Operator, Inc..
150 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
40.7346, -91.2768
County
Lee, IA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Interstate Power and Light Co | Interstate Power and Light Co | — |
| Owner(s) | Interstate Power and Light Co | Alliant Energy | — |
| Status | Operating | operating | — |
Wever Solar is a 150 MW solar photovoltaic power plant located in Lee County, Iowa. The plant, which began operating in 2024, is owned by Alliant Energy and operated by Interstate Power and Light Co. It utilizes single-axis tracking technology. Wever Solar is the second-largest solar plant in Iowa (out of 5) and ranks 408th nationally (out of 639).
The plant's latest annual generation was 260,475 MWh, resulting in a capacity factor of 19.8%. Wever Solar operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the MRO NERC region. Financial data indicates an installed cost of $1,766 per kW, based on FERC filings.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
161 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
9.8K MWh
Latest Month
260.5K MWh
Annual Generation
19.8%
Capacity Factor
$1,766/kW
Installed Cost
$4.6/MWh
Operating Cost
Interstate Power and Light Company
Reporting Utility
Annual Capital & Operating Expenses
Market Position
ISO/RTO Market
MISO
LMP Node
ALTW.WEVER.ESR
Pricing Hub
MINN.HUB
Location Type
Generation Node
Node Source
Curated node match
Alliant Energy Brings Solar, Wind, and Energy Storage Projects To Iowa
Alliant Energy maintains a balanced mix of energy resources that keep costs low and lights on for 1 million customers in Iowa and Wisconsin.
FlexGen begins operating 700MWh total BESS in Wisconsin, Iowa for Alliant Energy
Software-focused battery energy storage system (BESS) integrator FlexGen has put two utility-scale BESS projects in operation in Wisconsin...
Alliant Energy Launches Iowa’s Biggest Solar Project
Alliant Energy's Pleasant Creek Solar Project is now the biggest solar site in Iowa, supporting the company's all-of-the-above energy...
Alliant Energy brings Iowa’s largest solar field online
Iowa's new biggest solar field is now online: a 200-megawatt (MW) solar facility in Linn County, Iowa is now generating energy for Alliant Energy customers.
Last updated 2026-03-14
View all 8 articles