1.8 MW Solar operating in Union, AR — Midcontinent Independent Transmission System Operator, Inc..
1.8 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
33.2129, -92.6215
County
Union, AR
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Entegrity Solar El Dorado SD, LLC | — | — |
| Owner(s) | Entegrity Solar El Dorado SD, LLC | — | — |
| Status | Operating | operating | — |
El Dorado AR is a solar photovoltaic power plant located in Union County, Arkansas. The plant, owned and operated by Entegrity Solar El Dorado SD, LLC, has a total capacity of 1.8 MW. It commenced operations in 2024 and consists of a single generator utilizing single-axis solar tracking technology.
The plant's latest annual generation was 1,582 MWh, resulting in a capacity factor of 10.0%. El Dorado AR operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the SERC NERC region. In terms of size, the plant is ranked 51 out of 77 power plants in Arkansas and 5491 out of 7108 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
35 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
113 MWh
Latest Month
1.6K MWh
Annual Generation
10.0%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
ARKANSAS.HUB
Node Source
OSM spatial match