2.9 MW Solar operating in Kings, CA — California Independent System Operator
2.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
36.2706, -119.5182
County
Kings, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Bravo REC Management LLC | — | — |
| Owner(s) | Bravo REC Management LLC | — | — |
| Status | Operating | operating | — |
Lone Oak is a 2.9 MW solar photovoltaic power plant located in Kings County, California. The plant began operating in 2023 and has a single generator. It is owned and operated by Bravo REC Management LLC. As of the latest rankings, Lone Oak is the 429th largest power plant in California out of 862, and the 4081st largest in the United States out of 7108.
The plant utilizes single-axis tracking to maximize solar energy capture. In its most recent year of operation, Lone Oak generated 5,664 MWh of electricity, achieving a capacity factor of 22.2%. The plant is located within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
480 kV
Regulatory Status
NR
Entity Type
Industrial
Sector
Industrial Non-CHP
203 MWh
Latest Month
5.7K MWh
Annual Generation
22.2%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Laurel Substation · 66 kV
Substation Distance
< 10 km
Operator
Southern California Edison
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_ZP26_GEN-APND
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.