198.8 MW Wind operating in Oliver, ND — Southwest Power Pool
198.8 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2024
Operating Since
Coordinates
47.1243, -101.6124
County
Oliver, ND
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Oliver Wind IV, LLC | — | — |
| Owner(s) | Oliver Wind IV, LLC | — | — |
| Status | Operating | — | — |
Oliver Wind IV is a 198.8 MW wind power plant located in Oliver County, North Dakota. The facility began operating in 2024 and is owned and operated by Oliver Wind IV, LLC. The plant utilizes a single generator consisting of onshore wind turbines. The turbines have a hub height of 89 meters and a rotor diameter of 127 meters, and were manufactured by GE Wind, model GE2.82-127.
In its most recent year of operation, Oliver Wind IV generated 799,471 MWh of electricity, achieving a capacity factor of 45.9%. The plant is interconnected to the Southwest Power Pool (SPP) balancing authority and is situated within the MRO NERC region. Oliver Wind IV is ranked as the 8th largest wind farm out of 27 in North Dakota, and 366th out of 734 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Southwest Power Pool
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
82.0K MWh
Latest Month
799.5K MWh
Annual Generation
45.9%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
SPP
LMP Node
WAUE.OLVR.OLVR
Pricing Hub
SPP North Hub
Node Source
Curated node match
ND Public Service Commission approves permit for wind farm in Oliver County
The Oliver Wind IV project, operated by NextEra Energy, will consist of up to 73 wind turbines capable of generating up to 200 Megawatts.
Hearing set Monday on wind farm proposed for North Dakota coal country
The public will be able to weigh in Monday on a proposed wind farm in Oliver County, the heart of North Dakota coal country.
FERC Accepts Unexecuted Agreements Filed in Protest
FERC accepted unexecuted network upgrade agreements for wind farms in the Dakotas and Minnesota despite uncertainty over who should finance...