1.8 MW Solar operating in Orange, NY — New York Independent System Operator
1.8 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
41.4494, -74.5548
County
Orange, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Finchville Tpke LLC | — | — |
| Owner(s) | Finchville Tpke LLC | — | — |
| Status | Operating | operating | — |
The NY Finchville Tpke CSG is a solar photovoltaic power plant located in Orange County, New York. The plant, owned and operated by Finchville Tpke LLC, has a total capacity of 1.8 MW. Commercial operation began in 2024. The plant uses single-axis tracking to maximize solar energy capture.
The plant consists of one generator and connects to the grid within the New York Independent System Operator (NYISO) balancing authority, which is part of the Northeast Power Coordinating Council (NPCC) NERC region. In terms of size, the NY Finchville Tpke CSG ranks as the 625th largest power plant in New York and 5503rd nationally.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
New York Independent System Operator
Grid Voltage
13.2 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
—
Node Source
Plant coordinates only