145 MW Solar under construction in Caroline, MD — PJM Interconnection, LLC
145 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
Coordinates
39.0078, -75.7830
County
Caroline, MD
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cherrywood Solar, LLC | — | — |
| Owner(s) | Cherrywood Solar, LLC | — | — |
| Status | Under construction | construction | — |
Cherrywood Solar I is a 145 MW solar photovoltaic power plant located in Caroline County, Maryland. The plant's primary fuel source is solar energy. It is owned and operated by Cherrywood Solar, LLC. The facility consists of a single generator and utilizes fixed-tilt solar tracking technology.
Cherrywood Solar I operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. As of the latest rankings, it is the second-largest solar power plant in Maryland and ranks 429th nationally out of 639 solar plants. Regulatory news articles indicate some activity related to the plant.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
230 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
WESTERN HUB
Node Source
Plant coordinates only
Renewable Energy Certainty Act MD: 5 Key Impacts
Introduction: Solar Energy Maryland. At the very forefront of clean energy transformation, Maryland has established itself as a state with ambitious...
Last updated 2026-03-26
View all articles