5 MW Solar operating in Kennebec, ME — ISO New England Inc.
5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2022
Operating Since
Coordinates
44.5722, -69.6917
County
Kennebec, ME
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Nautilus Solar Solutions | Nautilus Solar Solutions | — |
| Owner(s) | Nautilus Solar Solutions | Nautilus Solar Solutions | — |
| Status | Operating | operating | — |
GEM identifies the owner as Nautilus Solar Solutions
This entity is not yet in the GEM ownership database — chain unavailable.
The Oakland solar photovoltaic plant is located in Kennebec County, Maine. The plant has a total capacity of 5 MW and began operating in 2022. It consists of a single generator utilizing fixed tilt solar tracking technology. The plant is owned and operated by Nautilus Solar Solutions.
Oakland's latest annual generation was 8,999 MWh, resulting in a capacity factor of 20.5%. It operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. The plant ranks 48th out of 153 power plants in Maine and 2837th out of 7108 plants nationally. Its primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
34.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
355 MWh
Latest Month
9.0K MWh
Annual Generation
20.5%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
UNKNOWN133030 · 115 kV
Substation Distance
1.164 km
Operator
CENTRAL MAINE POWER CO
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.COUNTYRD34.5
Pricing Hub
.Z.MAINE
Node Source
Curated node match
Adapture Renewables Closes $233 Million in Financing from U.S. Bank for Titanium Solar Projects in Illinois and Arkansas
OAKLAND, Calif. - Adapture Renewables, Inc. , a utility-scale solar and energy storage developer, owner, and operator, today announced the...
Proposed battery project site raises hackles in Oakland County
Groveland Township officials are advancing an ordinance that would place restrictions on battery energy storage systems that are beyond what the state requires.
Primergy Secures $588M in Project Financing and Power Purchase Agreement with Microsoft for 408 MW Solar Project in Texas
OAKLAND, Calif.--(BUSINESS WIRE)--Primergy Solar LLC ('Primergy'), a leading developer, owner, and operator of utility-scale solar and...
Last updated 2026-03-26