1.3 MW Solar operating in Kern, CA — California Independent System Operator
1.3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
35.0009, -118.8983
County
Kern, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | CTMW Solar, LLC | — | — |
| Owner(s) | CTMW Solar, LLC | — | — |
| Status | Operating | operating | — |
Tejon Castac Water District Solar is a 1.3 MW solar photovoltaic power plant located in Kern County, California. The plant began operating in 2024 and is owned and operated by CTMW Solar, LLC. It utilizes a single-axis tracking system to maximize solar energy capture. The plant is interconnected to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
In its most recent year of operation, Tejon Castac Water District Solar generated 2,521 MWh of electricity, achieving a capacity factor of 22.0%. The plant consists of a single generator. In terms of size, Tejon Castac Water District Solar ranks 676th out of 862 solar plants in California and 6029th out of 7108 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Commercial
Sector
Commercial Non-CHP
188 MWh
Latest Month
2.5K MWh
Annual Generation
22.0%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_SP15_GEN-APND
Node Source
OSM spatial match