11.8 MW BESS operating in Weld, CO — Western Area Power Administration - Rocky Mountain Region
11.8 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2024
Operating Since
Coordinates
40.1462, -104.5487
County
Weld, CO
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | United Power, Inc | Ameresco | — |
| Owner(s) | Ameresco | Ameresco | — |
| Status | Operating | — | — |
Keenesburg Battery Storage is a battery energy storage system (BESS) located in Weld County, Colorado. The plant has a total capacity of 11.8 MW and came online in 2024. It is owned by Ameresco and operated by United Power, Inc. The facility utilizes lithium-ion batteries (LIB) and has a total storage capacity of 47 MWh, providing a duration of approximately 3.98 hours at full output.
The plant consists of a single generator and operates within the Western Electricity Coordinating Council (WECC) NERC region. Its balancing authority is the Western Area Power Administration - Rocky Mountain Region. Keenesburg Battery Storage is ranked as the 11th largest of 18 battery storage facilities in Colorado, and 726th nationally out of 1205 such facilities. The plant's primary fuel is electricity (MWH), indicating it charges from the grid.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Western Area Power Administration - Rocky Mountain Region
Grid Voltage
13.2 kV
Regulatory Status
RE
Entity Type
Cooperative
Sector
Electric Utility
−169 MWh
Net Charging
-1.1K MWh
Annual Net Energy
-1.1%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
Why data centers will need a ‘bring your own power’ strategy
If the AI boom is not handled correctly, we will put grid stability and public trust at odds with tech-led growth, writes Ameresco CEO George Sakellaris.
United Power seeks "hyperlocal" energy for Colorado customers after dumping longtime supplier
Brighton-based co-op is building a portfolio of suppliers after paying $627M to leave Tri-State Generation and Transmission Association.
Nucor Kingman Mill Installs 50MW/200 MWh Battery Energy Storage System Developed by Ameresco
Nucor Corporation (NYSE:NUE) is one of the best infrastructure stocks to buy with huge upside. On October 17, Ameresco Inc. (NYSE:AMRC)...
Arizona industrial steel manufacturer to power electric arc furnace with solar and storage
Steel producer Nucor tapped Ameresco for a 50 MW / 200 MWh battery energy storage system to stabilize its electricity demand.
Last updated 2026-03-21