7.8 MW BESS operating in Weld, CO — Western Area Power Administration - Rocky Mountain Region
7.8 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2024
Operating Since
Coordinates
40.2194, -104.9422
County
Weld, CO
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | United Power, Inc | Ameresco | — |
| Owner(s) | Ameresco | Ameresco | — |
| Status | Operating | — | — |
Mead Battery Storage is a 7.8 MW battery energy storage system located in Weld County, Colorado. The plant began operating in 2024 and is owned by Ameresco. United Power, Inc. is the operator. The facility utilizes batteries as its primary fuel source (MWH) and consists of a single generator. The battery system has a total storage capacity of 31.3 MWh, providing a duration of approximately 4.01 hours. The battery chemistry is lithium-ion (LIB).
The plant operates within the Western Electricity Coordinating Council (WECC) NERC region and is under the balancing authority of the Western Area Power Administration - Rocky Mountain Region. Mead Battery Storage is ranked as the 16th largest of 18 battery storage facilities in Colorado, and 892nd nationally out of 1205 such facilities.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Western Area Power Administration - Rocky Mountain Region
Grid Voltage
13.2 kV
Regulatory Status
RE
Entity Type
Cooperative
Sector
Electric Utility
−98 MWh
Net Charging
-691 MWh
Annual Net Energy
-1.0%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
Why data centers will need a ‘bring your own power’ strategy
If the AI boom is not handled correctly, we will put grid stability and public trust at odds with tech-led growth, writes Ameresco CEO George Sakellaris.
Nucor Kingman Mill Installs 50MW/200 MWh Battery Energy Storage System Developed by Ameresco
Nucor Corporation (NYSE:NUE) is one of the best infrastructure stocks to buy with huge upside. On October 17, Ameresco Inc. (NYSE:AMRC)...
Arizona industrial steel manufacturer to power electric arc furnace with solar and storage
Steel producer Nucor tapped Ameresco for a 50 MW / 200 MWh battery energy storage system to stabilize its electricity demand.
Ameresco, Alliant Energy, begin operating record-breaking BESS projects in Arizona, Wisconsin
Ameresco has put Arizona's largest behind-the-meter battery energy storage system (BESS) into operation, meanwhile Alliant Energy has begun...
Last updated 2026-03-21
View all 10 articles