16 MW Solar operating in Fayette, TN — Tennessee Valley Authority
16 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
35.1418, -89.5897
County
Fayette, TN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SR Canadaville, LLC | — | — |
| Owner(s) | SR Canadaville, LLC | — | — |
| Status | Operating | operating | — |
SR Canadaville, LLC is a 16 MW solar photovoltaic power plant located in Fayette County, Tennessee. The plant began operating in 2024 and is owned and operated by SR Canadaville, LLC. It consists of a single generator utilizing single-axis tracking technology to maximize solar energy capture. The plant is interconnected with the Tennessee Valley Authority (TVA) balancing authority, within the SERC NERC region.
In its most recent year of operation, SR Canadaville, LLC generated 36,093 MWh of electricity, achieving a capacity factor of 25.7%. The plant's primary fuel source is solar energy. SR Canadaville, LLC is ranked as the 16th largest solar power plant in Tennessee out of 60, and nationally it is ranked 1645 out of 7108 plants. Financial data for the plant is available from LBNL, though specific details are not provided.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Tennessee Valley Authority
Grid Voltage
13.2 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
1.4K MWh
Latest Month
36.1K MWh
Annual Generation
25.7%
Capacity Factor
$66.0/MWh
LCOE (Levelized Cost)
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.