1.4 MW Solar operating in Frederick, VA — PJM Interconnection, LLC
1.4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
39.2016, -78.2139
County
Frederick, VA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Distributed Solar Development, LLC | Distributed Solar Development LLC | — |
| Owner(s) | Distributed Solar Development, LLC | Distributed Solar Development LLC | — |
| Status | Operating | operating | — |
GEM identifies the owner as Distributed Solar Development LLC
This entity is not yet in the GEM ownership database — chain unavailable.
The Village at Orchard Ridge (TVOR) is a 1.4 MW solar photovoltaic power plant located in Frederick County, Virginia. The plant began operating in 2023 and has one generator. It is owned and operated by Distributed Solar Development, LLC. TVOR interconnects to the PJM Interconnection, LLC balancing authority, within the RFC NERC region.
In its most recent year of operation, the plant generated 2,205 MWh of electricity, achieving a capacity factor of 17.9%. The plant utilizes a fixed tilt solar tracking system. TVOR is ranked as the 165th largest power plant in Virginia out of 168, and ranks 5977th nationally out of 7108 plants. The plant's primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
0.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
110 MWh
Latest Month
2.2K MWh
Annual Generation
17.9%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
West Winchester Substation · 138 kV
Substation Distance
1.633 km
Operator
The Potomac Edison Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
WWINCHES138 KV T3
Pricing Hub
DOMINION HUB
Location Type
Load Node
Node Source
Curated node match