15.4 MW Solar operating in Warren, NJ — PJM Interconnection, LLC
15.4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
40.8000, -75.0900
County
Warren, NJ
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | NJR Clean Energy Ventures Corporation | NJR Clean Energy Ventures Corp | — |
| Owner(s) | NJR Clean Energy Ventures Corporation | NJR Clean Energy Ventures Corp | — |
| Status | Operating | operating | — |
GEM identifies the owner as NJR Clean Energy Ventures Corp
This entity is not yet in the GEM ownership database — chain unavailable.
Foul Rift Solar Farm is a 15.4 MW solar photovoltaic power plant located in Warren County, New Jersey. The plant began operating in 2025 and is owned and operated by NJR Clean Energy Ventures Corporation. It utilizes a fixed-tilt solar tracking system. The plant is connected to the PJM Interconnection, LLC balancing authority, within the RFC NERC region.
The Foul Rift Solar Farm is the 8th largest solar power plant in New Jersey out of 328 plants, and ranks 1661st nationally out of 7108 solar plants. The facility consists of a single generator and uses SUN as its primary fuel source.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
34.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Foul Rift Solar Farm
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Martins Creek Substation · 230 kV
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
WESTERN HUB
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
Solar is 77.7% of new capacity added to U.S. grid in 2025
Solar reached 11% of U.S. electric generation capacity, said data through April from the Federal Energy Regulatory Commission.
Newly constructed Warren County solar farm needs approval to power up
The Foul Rift Solar Farm in White Township is ready to start generating power but must first get final major site plan approval from the township's planning...
Shuttered New Jersey compost facility hosts 19-MW solar project
CEP Renewables, NJR Clean Energy Ventures and CS Energy have completed the 19-MWDC Foul Rift solar project in White Township of Warren...
Last updated 2026-03-14
View all articles