150 MW BESS under construction in Riverside, CA — California Independent System Operator
150 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
—
Operating Since
Coordinates
33.7423, -117.1611
County
Riverside, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Trestles Grid LLC | — | — |
| Owner(s) | Trestles Grid LLC | — | — |
| Status | Under construction | — | — |
Trestles Grid LLC is a 150 MW battery energy storage system located in Riverside County, California. The plant, identified by plant ID 67229, is owned and operated by Trestles Grid LLC. It consists of a single generator utilizing batteries as its energy source, categorized under the primary fuel type "MWH." The facility operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
Trestles Grid ranks as the 85th largest power plant in California out of 112 facilities and holds the 395th position nationally among 514 plants.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
115 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Valley Substation · 500 kV
Substation Distance
0.614 km
Operator
Southern California Edison
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
VALLEYSC_1_N001
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match