19.8 MW Solar operating in Allegany, MD — PJM Interconnection, LLC
19.8 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
39.5980, -78.9510
County
Allegany, MD
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Jade Meadow LLC | REV Renewables | — |
| Owner(s) | Jade Meadow LLC | REV Renewables | — |
| Status | Operating | operating | — |
GEM identifies the owner as REV Renewables
This entity is not yet in the GEM ownership database — chain unavailable.
Jade Meadow LLC is a 19.8 MW solar photovoltaic power plant located in Allegany County, Maryland. The plant, owned and operated by Jade Meadow LLC, commenced operations in 2024. It utilizes fixed-tilt solar tracking technology. As of its first year of operation, it ranks as the 14th largest solar facility in Maryland out of 183, and 1584th nationally out of 7108 plants.
In its first year, Jade Meadow LLC generated 29,063 MWh of electricity, achieving a capacity factor of 16.7%. The plant operates within the PJM Interconnection, LLC balancing authority, which is part of the RFC NERC region. Financial data is available for the plant from LBNL, and the plant has been mentioned in at least one news article related to regulatory matters.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
34.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Jade Meadow
1.1K MWh
Latest Month
29.1K MWh
Annual Generation
16.7%
Capacity Factor
$49.4/MWh
LCOE (Levelized Cost)
Market Position
ISO/RTO Market
PJM
LMP Node
CARLOJCT34.5 KV T1_LOAD
Pricing Hub
WESTERN HUB
Location Type
Load Node
Node Source
Curated node match
Maryland receives five applications for 800 MW battery storage solicitation
The Maryland Public Service Commission said this week it received five applications for the award of energy storage capacity credits in the...
Wärtsilä has delivered a 125 MW / 250 MWh energy storage system to REV Renewables to support grid stability and meet decarbonisation goals in California
Wärtsilä reached substantial completion on a 125-megawatt (MW) / 250-megawatt hour (MWh) energy storage system in Calexico, California, USA, for REV Renewables.
Last updated 2026-03-14