2 MW Solar operating in Montgomery, MD — PJM Interconnection, LLC
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
39.1937, -77.1187
County
Montgomery, MD
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Greenbacker Renewable Energy Corporation | Greenbacker Renewable Energy Corp | — |
| Owner(s) | Greenbacker Renewable Energy Corporation | Greenbacker Renewable Energy Corp | — |
| Status | Operating | operating | — |
GEM identifies the owner as Greenbacker Renewable Energy Corp
This entity is not yet in the GEM ownership database — chain unavailable.
Oaks Landfill - ANEM is a 2 MW solar photovoltaic power plant located in Montgomery County, Maryland. The plant began operating in 2024 and utilizes fixed-tilt solar tracking. It has one generator and is owned and operated by Greenbacker Renewable Energy Corporation. The plant's primary fuel source is solar energy (SUN).
In its latest year of operation, Oaks Landfill - ANEM generated 2,657 MWh of electricity, achieving a capacity factor of 15.1%. The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In terms of size, it is ranked 115 out of 183 power plants in Maryland, and 5306 out of 7108 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
15 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
185 MWh
Latest Month
2.7K MWh
Annual Generation
15.1%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Mount Zion Substation · 230 kV
Substation Distance
4.951 km
Operator
PEPCO
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
PEPCO MD
Pricing Hub
WESTERN HUB
Location Type
AGGREGATE
Node Source
Curated node match