20 MW Solar operating in Gladwin, MI — Midcontinent Independent Transmission System Operator, Inc..
20 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
43.9885, -84.5223
County
Gladwin, MI
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Willford Solar, LLC | Irradiant Partners | — |
| Owner(s) | Willford Solar, LLC | Irradiant Partners | — |
| Status | Operating | operating | — |
GEM identifies the owner as Irradiant Partners
This entity is not yet in the GEM ownership database — chain unavailable.
Willford Solar, LLC is a 20 MW solar photovoltaic power plant located in Gladwin County, Michigan. The plant, which began operating in 2023, utilizes single-axis tracking technology to maximize solar energy capture. It is owned and operated by Willford Solar, LLC. The plant is connected to the Midcontinent Independent Transmission System Operator (MISO) grid and falls under the RFC NERC region.
In its most recent year of operation, Willford Solar generated 33,749 MWh of electricity, achieving a capacity factor of 19.2%. The plant ranks as the 34th largest solar facility in Michigan out of 84, and nationally it ranks 1448 out of 7108. Financial data for the plant is available from LBNL Solar.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
46 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
677 MWh
Latest Month
33.7K MWh
Annual Generation
19.2%
Capacity Factor
$25.1/MWh
LCOE (Levelized Cost)
$32.0/MWh
Energy Value
Point of Interconnection
Nearest Substation
Grout Substation · 138 kV
Substation Distance
< 10 km
Operator
Consumers Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MICHIGAN.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.