1.2 MW Solar operating in Tulare, CA — California Independent System Operator
1.2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
35.9728, -119.3943
County
Tulare, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Bravo REC Management LLC | — | — |
| Owner(s) | Bravo REC Management LLC | — | — |
| Status | Operating | operating | — |
Case Vander Eyk, Jr Dairy Solar is a 1.2 MW solar photovoltaic power plant located in Tulare County, California. The plant began operating in 2023 and is owned and operated by Bravo REC Management LLC. It consists of a single generator utilizing single-axis tracking technology to maximize solar energy capture. The plant is interconnected to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
In its most recent year of operation, Case Vander Eyk, Jr Dairy Solar generated 2,247 MWh of electricity, achieving a capacity factor of 21.3%. The plant's size ranks it as the 712th largest solar facility in California out of 862, and 6125th nationally out of 7108. The plant's primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
480 kV
Regulatory Status
NR
Entity Type
Industrial
Sector
Industrial Non-CHP
83 MWh
Latest Month
2.2K MWh
Annual Generation
21.3%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_ZP26_GEN-APND
Node Source
OSM spatial match