385 MW Batteries (200 MW) + Solar Photovoltaic (185 MW) under construction in Jones, TX — Electric Reliability Council of Texas, Inc.
385 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
—
Operating Since
Coordinates
32.7949, -99.9929
County
Jones, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Lightsource Renewable Energy Asset Management, LLC | Lightsource Renewable Energy Asset Management LLC | — |
| Owner(s) | Jones City Solar, LLC | Lightsource Renewable Energy Asset Management LLC | — |
| Status | Under construction | construction | — |
GEM identifies the owner as Lightsource Renewable Energy Asset Management LLC
This entity is not yet in the GEM ownership database — chain unavailable.
Jones City 2 Solar is a 385 MW hybrid power plant located in Jones County, Texas. The facility, identified by plant ID 66893, is owned and operated by Lightsource Renewable Energy Asset Management, LLC. The plant utilizes both solar photovoltaic technology and batteries, with two generators on site. The primary fuel source is listed as MWH, indicating electricity input for the battery component.
The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority. Jones City 2 Solar is ranked as the 32nd largest power plant in Texas out of 224, and nationally it is ranked 105th out of 514. The solar photovoltaic arrays utilize a fixed tilt tracking system.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Radium Substation · 138 kV
Substation Distance
< 10 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Seeing double the solar installations in Oregon | Projects Weekly
Avangrid has energized two solar projects in Wasco County, Oregon, totaling 200 MWac. Plus, Zelestra has expanded its relationship with Meta...
Seeing double the solar installations in Oregon | Projects Weekly
Avangrid has energized two solar projects in Wasco County, Oregon, totaling 200 MWac. Plus, Zelestra has expanded its relationship with Meta...
Seeing double the solar installations in Oregon | Projects Weekly
Avangrid has energized two solar projects in Wasco County, Oregon, totaling 200 MWac. Plus, Zelestra has expanded its relationship with Meta...
Seeing double the solar installations in Oregon | Projects Weekly
Avangrid has energized two solar projects in Wasco County, Oregon, totaling 200 MWac. Plus, Zelestra has expanded its relationship with Meta...
Last updated 2026-03-26
View all 10 articles