1 MW Solar operating in Somerset, ME — ISO New England Inc.
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
44.9634, -69.8918
County
Somerset, ME
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Luminace Sunbeam Development Holdings, LLC | — | — |
| Owner(s) | Luminace Sunbeam Development Holdings, LLC | — | — |
| Status | Operating | operating | — |
Cenergy - Kiger is a 1 MW solar photovoltaic power plant located in Somerset County, Maine. The plant began operating in 2023 and has a single generator utilizing single-axis tracking. Luminace Sunbeam Development Holdings, LLC is the owner and operator. The plant is interconnected to the ISO New England Inc. balancing authority and is within the Northeast Power Coordinating Council (NPCC) NERC region.
In its most recent year of operation, Cenergy - Kiger generated 1,969 MWh of electricity, achieving a capacity factor of 22.4%. According to state rankings, the facility is the 151st largest of 153 power plants in Maine. Nationally, it ranks as the 6468th largest of 7108 plants. The plant's primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
80 MWh
Latest Month
2.0K MWh
Annual Generation
22.4%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Embden Substation · 115 kV
Substation Distance
0.765 km
Operator
Central Maine Power Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.EMBDEN 12.5
Pricing Hub
.Z.MAINE
Node Source
Curated node match