2.9 MW Solar operating in Lewis, NY — New York Independent System Operator
2.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
43.8631, -75.7193
County
Lewis, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | NY USLE Copenhagen CR194 LLC | — | — |
| Owner(s) | NY USLE Copenhagen CR194 LLC | — | — |
| Status | Operating | operating | — |
Copenhagen Solar is a 2.9 MW solar photovoltaic power plant located in Lewis County, New York. The plant began operating in 2024 and is owned and operated by NY USLE Copenhagen CR194 LLC. It consists of a single generator utilizing fixed-tilt solar tracking technology.
The plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In its most recent year of operation, Copenhagen Solar generated 2,322 MWh of electricity, achieving a capacity factor of 9.1%. The plant's generating capacity ranks it as the 425th largest in New York State out of 695 plants, and 4100th nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
New York Independent System Operator
Grid Voltage
13.2 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
82 MWh
Latest Month
2.3K MWh
Annual Generation
9.1%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
COPENHAGEN_WT_PWR
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone E
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.