80 MW BESS operating in Tulare, CA — California Independent System Operator
80 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2024
Operating Since
Coordinates
35.8384, -119.0884
County
Tulare, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | VESI 12 LLC | — | — |
| Owner(s) | VESI 12 LLC | — | — |
| Status | Operating | — | — |
Bottleneck Energy Storage is an 80 MW battery energy storage system located in Tulare County, California. The plant, which began operating in 2024, is owned and operated by VESI 12 LLC. It utilizes lithium-ion battery (LIB) technology and has a total storage capacity of 320 MWh, providing a duration of 4 hours at full output. The plant's primary fuel is listed as MWH, indicating it draws power from the grid to charge its batteries.
Bottleneck Energy Storage operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. It ranks as the 130th largest power plant in California out of 300, and 543rd nationally out of 1205. The facility consists of a single generator.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
66 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
−863 MWh
Net Charging
-13.4K MWh
Annual Net Energy
-1.9%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Vestal Substation · 220 kV
Substation Distance
0.565 km
Operator
Southern California Edison
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
REXFRD_2_RSFBX2-APND
Pricing Hub
TH_ZP26_GEN-APND
Location Type
Aggregated Node
Node Source
Curated node match
US AI boom faces electric shock
Big Tech's race to dominate artificial intelligence may soon hit a nasty road bump as U.S. electricity grids struggle to keep pace with the...
CTR Launches American Data Power to Deliver 600 MW Energy Complex in California’s Salton Sea Geothermal Field
Controlled Thermal Resources Holdings Inc. (“CTR”), a U.S. geothermal resource developer, today announced the launch of American Data Power...
Resolving the Interconnection Queue Bottleneck Along with Transmission Expansion is Critical for Timely U.S. Energy Deployment to Meet Demand
The deployment of clean energy will be essential for meeting the historic electricity demand surge, which is forecasted to require more than...
Mexico Solar 2026: Growth Meets the Storage Bottleneck
Mexico's solar market is pivoting to focus on energy storage and grid integration to support nearshoring resilience, writes Marcos Ripoll.
Last updated 2026-03-14
View all 10 articles