5 MW BESS operating in Franklin, VT — ISO New England Inc.
5 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2023
Operating Since
Coordinates
44.6977, -73.1247
County
Franklin, VT
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Strata Manager, LLC | — | — |
| Owner(s) | Strata Manager, LLC | — | — |
| Status | Operating | — | — |
Georgia Ballard BESS is a 5 MW battery energy storage system located in Franklin County, Vermont. The plant began operating in 2023 and is owned and operated by Strata Manager, LLC. It is interconnected to the ISO New England Inc. balancing authority and is within the NPCC NERC region. The facility has one generator utilizing batteries as its technology and MWH as its primary fuel.
The battery system has a total storage capacity of 10 MWh, providing a duration of 2 hours at its full 5 MW output. The battery chemistry is lithium-ion (LIB). Georgia Ballard BESS is ranked as the 5th largest of 8 battery storage plants in Vermont, and 981st nationally out of 1205 such facilities.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
−55 MWh
Net Charging
-535 MWh
Annual Net Energy
-1.2%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Ballard Road Substation · 35 kV
Substation Distance
2.977 km
Operator
Green Mountain Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.GEORGIA 34.5
Pricing Hub
.Z.VERMONT
Node Source
Curated node match