403.6 MW Batteries (104 MW) + Solar Photovoltaic (300 MW) operating in Hopkins, TX — Electric Reliability Council of Texas, Inc.
403.6 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2025
Operating Since
Coordinates
33.2239, -95.7308
County
Hopkins, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Bright Arrow Solar, LLC | — | — |
| Owner(s) | Bright Arrow Solar, LLC | — | — |
| Status | Operating | operating | — |
Bright Arrow Solar, LLC, located in Hopkins County, Texas, is a hybrid power plant with a total capacity of 403.6 MW. The plant, identified by plant ID 66688, began operating in 2025 and is owned and operated by Bright Arrow Solar, LLC. It utilizes both solar photovoltaic technology and batteries, with the primary fuel source listed as MWH. The facility consists of two generators and employs fixed-tilt solar tracking. The battery energy storage system (BESS) has a duration of 0.97 hours.
The plant operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority and the TRE NERC region. In its latest year of operation, Bright Arrow Solar generated 359,067 MWh, achieving a capacity factor of 15.1%. Bright Arrow Solar ranks as the 24th largest plant out of 224 in Texas and 86th nationally out of 514.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Bright Arrow Solar
30.1K MWh
Latest Month
359.1K MWh
Annual Generation
15.1%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
ERCOT
LMP Node
BR_ARROW_ALL
Pricing Hub
HB_NORTH
Secondary Zone
LZ_NORTH
Location Type
Resource Node
Node Source
Curated node match
Solar was 75% of new US generating capacity in first five months of 2025
A review by the SUN DAY Campaign of data very belatedly released by the Federal Energy Regulatory Commission (FERC) reveals that the...
Texas set for 1.35 GWh of large-scale BESS
French oil major TotalEnergies and German-owned renewables developer RWE have announced plans for five large-scale batteries in the US...
RWE starts construction of battery storage projects with a combined capacity of 450 MW in the U.S.
The company broke ground on three battery energy storage systems (BESS) in Texas, bringing RWE's total battery storage projects under construction to 931...
RWE completes three U.S. battery storage projects in Texas and Arizona totaling 190 megawatts
The three BESS projects – Bright Arrow, Big Star and Mesquite 4 – bring RWE's total battery storage capacity in the US to about 512 MW.
Last updated 2026-03-14
View all 6 articles