150 MW Solar planned in Stark, OH — PJM Interconnection, LLC
150 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
40.8527, -81.1570
County
Stark, OH
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Samsung C&T Renewables, LLC | Samsung C&T Corp | — |
| Owner(s) | Samsung C&T Renewables, LLC | Samsung C&T | — |
| Status | Planned | announced | — |
Stark Solar, LLC is a 150 MW solar photovoltaic power plant located in Stark County, Ohio. The plant, identified by plant ID 66672, utilizes fixed-tilt solar tracking technology. It consists of a single generator and is owned by Samsung C&T, a company based in South Korea. The operator listed with the EIA is Samsung C&T Renewables, LLC.
The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. Stark Solar ranks as the 16th largest solar plant in Ohio out of 31, and nationally it ranks 366th out of 639 solar plants. The plant's operations have been the subject of 3 news articles, all pertaining to regulatory matters.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Beechwood Substation · 69 kV
Substation Distance
< 10 km
Operator
FirstEnergy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
AEP-DAYTON HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Dukhan solar plant: QatarEnergy and Samsung close deal
QatarEnergy has signed a contract with Samsung C&T for the construction of the Dukhan solar power plant, a renewable energy megaproject that...
Houston's LandBridge strikes deal with Samsung for battery storage projects in West Texas
LandBridge signed a deal with Samsung C&T Renewables for two potential battery energy storage project sites in West Texas with 350 MW...
Holtec Calls It Quits on New Mexico Spent Fuel Plan
Holtec Calls It Quits on New Mexico Spent Fuel Plan Whatever Happened to DOE's RFI for a CISF? ECA's Collaboration Based Siting for...
Ohio regulators kill Stark Solar farm, latest victim of local Republican opposition
The Ohio Power Siting Board killed yet another proposed solar development in Ohio, citing local opposition.
Last updated 2026-03-26
View all 9 articles