111 MW Solar operating in Martin, KY — PJM Interconnection, LLC
111 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
37.7655, -82.4741
County
Martin, KY
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Martin County Solar Project, LLC | Savion LLC [100%] | — |
| Owner(s) | Martin County Solar Project, LLC | Savion LLC [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Savion LLC [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Martin County Solar Project, LLC is a 111 MW solar photovoltaic power plant located in Martin County, Kentucky. The plant began operating in 2024 and is owned and operated by Martin County Solar Project, LLC. It utilizes single-axis tracking technology to maximize solar energy capture. The plant is interconnected to the grid within the PJM Interconnection, LLC balancing authority, which falls under the SERC NERC region.
The plant's latest annual generation was 210,877 MWh, resulting in a capacity factor of 21.7%. Martin County Solar Project, LLC ranks as the 11th largest solar plant out of 13 in Kentucky, and 519th nationally out of 639. Financial data is available for the plant from LBNL, and it has been the subject of 10 news articles, with coverage split evenly between grid-related topics and deals.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
7.2K MWh
Latest Month
210.9K MWh
Annual Generation
21.7%
Capacity Factor
$41.1/MWh
LCOE (Levelized Cost)
Market Position
ISO/RTO Market
PJM
LMP Node
INEZ 34.5 KV MARTC2SP
Pricing Hub
AEP-DAYTON HUB
Location Type
Generation Node
Node Source
Curated node match
New 1.2-GW Gas-Fired Plant Planned in WV; Three Solar Projects Also Announced
Two subsidiaries of FirstEnergy Corp. announced plans to build a new 1200-MW natural gas-fired power plant on land adjacent to the...
FirstEnergy Plan Calls for New Gas-Fired Plant, Continued Coal-Fired Generation
FirstEnergy Corp. has submitted a plan to build a new 1200-MW natural gas-fired combined-cycle power plant to serve customers in West...
A $1B Eastern KY coal-to-solar project gets approval to start construction
Developers anticipate employing 250 people during construction of a 210-megawatt facility on a 2000-acre site across three counties.
Shell’s Savion, Ares Launch Tango JV to Manage 496 MW of U.S. Solar Projects
Tango will hold equity in five Savion-developed solar projects, including the Martin County and Kiowa County Solar Projects.
Last updated 2026-03-14
View all 10 articles