300 MW Batteries (100 MW) + Solar Photovoltaic (200 MW) operating in Yuma, AZ — California Independent System Operator
300 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2023
Operating Since
Coordinates
32.9375, -113.4575
County
Yuma, AZ
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Clean Energy | AES Clean Energy | — |
| Owner(s) | AES Clean Energy | AES Clean Energy | — |
| Status | Operating | operating | — |
GEM identifies the owner as AES Clean Energy
This entity is not yet in the GEM ownership database — chain unavailable.
McFarland A Solar and Storage is a 300 MW hybrid power plant located in Yuma County, Arizona. The plant, which began operating in 2023, is owned and operated by AES Clean Energy. It utilizes both solar photovoltaic technology and battery energy storage. The solar component uses single-axis tracking. The battery energy storage system (BESS) has a capacity of 400 MWh, providing 4 hours of duration, and uses lithium-ion battery (LIB) chemistry. The plant is interconnected to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
In its most recent year of operation, McFarland A Solar and Storage generated 542,282 MWh, resulting in a capacity factor of 20.6%. The plant is ranked as the 25th largest in Arizona out of 47 plants, and 154th nationally out of 514 plants. Financial data is available for the plant from LBNL, and the plant has been mentioned in three news articles, covering industry and regulatory topics.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
500 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
28.2K MWh
Latest Month
542.3K MWh
Annual Generation
20.6%
Capacity Factor
$29.0/MWh
LCOE (Levelized Cost)
$12.2/MWh
Energy Value
Market Position
ISO/RTO Market
CAISO
LMP Node
HN_LNODER2A
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
Feds to Lease 8,000 Acres at Hanford Nuclear Waste Site for Solar Power, Batteries
Clean power developer Hecate aims to build arrays on 8000 acres of unused and repurposed federal land at former nuclear weapons megasite...
AES Corporation built 3.5GW of renewables capacity in 2023
US utility AES Corporation built 3.5GW of renewable energy generation projects in 2023, led by solar PV installations.
AES Completes Construction of 3.5 GW of Renewables in 2023
Construction Milestone Marks the Largest Renewables Capacity Addition by AES in a Single Year. ARLINGTON, Va., Jan.
AES Completes Construction of 3.5 GW of Renewables in 2023
Construction Milestone Marks the Largest Renewables Capacity Addition by AES in a Single Year. ARLINGTON, Va., Jan.
Last updated 2026-03-26