1 MW Solar operating in Carroll, AR — Midcontinent Independent Transmission System Operator, Inc..
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2018
Operating Since
Coordinates
36.3734, -93.5862
County
Carroll, AR
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Today's Power, Inc. | Today's Power, Inc. | — |
| Owner(s) | Today's Power, Inc. | — | — |
| Status | Operating | operating | — |
Berryville School District Solar is a 1 MW solar photovoltaic power plant located in Carroll County, Arkansas. The plant began operating in 2018 and has a single generator. Today's Power, Inc. is the plant's operator. The facility utilizes fixed-tilt solar tracking technology.
The plant's latest annual generation was 1,809 MWh, resulting in a capacity factor of 20.6%. Berryville School District Solar operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the SERC NERC region. In terms of size, the plant ranks 58th out of 77 solar facilities in Arkansas and 6451st nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
0.48 kV
Regulatory Status
RE
Entity Type
Cooperative
Sector
Electric Utility
97 MWh
Latest Month
1.8K MWh
Annual Generation
20.6%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Berryville Substation · 161 kV
Substation Distance
< 10 km
Operator
Entergy Arkansas
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
ARKANSAS.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.