2 MW Solar testing in Dallas, TX — Electric Reliability Council of Texas, Inc.
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
Coordinates
32.7744, -96.5667
County
Dallas, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Catalyze Sunnyvale 367 Long Creek Road Microgrid, LLC | Catalyze Sunnyvale 367 Long Creek Road Microgrid | — |
| Owner(s) | Catalyze Sunnyvale 367 Long Creek Road Microgrid, LLC | — | — |
| Status | Testing | operating | — |
TX Sunnyvale 367 Long Creek Road Solar is a 2 MW solar photovoltaic power plant located in Dallas County, Texas. The plant is owned and operated by Catalyze Sunnyvale 367 Long Creek Road Microgrid, LLC. It consists of a single generator utilizing fixed-tilt solar tracking technology.
The plant's balancing authority is the Electric Reliability Council of Texas, Inc. (ERCOT), and it falls within the TRE NERC region. According to state rankings, TX Sunnyvale 367 Long Creek Road Solar is the 282nd largest solar plant in Texas out of 298. Nationally, it ranks as the 4874th largest out of 7108 solar plants. The plant's primary fuel source is solar energy (SUN).
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
4.8 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
East Mesquite Substation · 138 kV
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.